Sen. Suswam’s Constituency projects in Logo

Nigerian Concord Newspaper

(A) UGONDO CLAN

1a) Construction of a 7.5 MVA Injection Power Sub – Station at Ugba – Site cleared and work in progress.

1b) Construction of a Block of 3 Classrooms, VIP Toilet and Borehole at LGEA Primary School at Tse – Orlalu, Yonov ward, Ugondo.

2) Construction of a Block of 3 Classrooms at LGEA Primary School, Ugba, Mbayam ward, Ugondo (Contact person is Hon. Kester Kyenge)

3) Construction of Motorized Borehole with 10, 000 litres overhead water tank at Tse – Doguno, Yonov ward, Ugondo – contact person is Hon. Terkaa Mamwoo

4) Electrification and Installation of 300 KVA Transformer at Nenger Utim and Tsenge, Mbayam ward, Ugondo – Completed – contact person is Hon. Charles Tema

5) Extension of Electricity from Ikyor Junction to Ikyor Market, Nenzev ward, Ugondo – Ongoing, contact person is Hon. Kester Kyenge

6) Electrification and Installation of a 300KVA Transformer at Gwabo, Mbayam ward, Ugondo – ongoing, contact person Hon. Kester Kyenge

7) Extension of Electricity to Tse Asom, Mbater ward, Ugondo – ongoing, contact person is Julius Asom

8) Construction of a Block of 3 Classrooms at Abeda – Mbadyul, Mbadyul ward, Ugondo, Contact person is Terkula Abeda

9) Construction of a Motorized Borehole with 10, 000 litres overhead water tank at Christ the King Catholic Church, Gwabo, Mbayam ward, Ugondo (Contact person is Hon. Kester Kyenge)

10) Supply and Installation of Solar Street Lights at the residence of Mue Ter Ichongo and the Five (5) Ward Heads (Tyoor) in Ugondo Viz: Tyoor Mbayam, Tyoor Mbater, Tyoor Nenzev, Tyoor Mbadyul and Tyoor Yonov in Ugondo.

11) Solar Street Lights were supplied and installed at the following selected locations across the 5 wards in Ugondo: Ugba township, Abeda – Mbadyul, Tine Nune, Ikyor, Asom, Imande Adega, Gwabo, Wende, Tse – Ikyegh, Tse – Orlalu, Agasar, Tse – Burbwa and Tse – Tyokaa etc.

(B) GAAMBE – TIEV CLAN

1a) The Son of Hon. Job Tiza, whose name is Tiza Marvins Gwarza recently given employment with Transmission Company of Nigeria (TCN).

1b) Installation of Solar Street lights at selected locations in Ayilamo, Tombo ward.

2) Extension of Electricity from Ayilamo to Anyebe, Tombo ward – ongoing (contact person – Joe K)

3) Extension of Electricity to Azege, Tombo ward – Ongoing (contact person – Joe K)

4) Construction of a Block of Three Classrooms at Abur – Kpera, Tombo ward (Contact person is Hon. Patrick, PDP Chairman, Logo LGA).

5) Construction of a Block of Three Classrooms at Tse – Tor Adi, Mbabeghea,, Ukemberagya/Tswarev ward – Ongoing

6) Transformer (33/300 KVA supplied and installed at Chembe in Ukemberagya/ Tswarev ward

7) Solar Street light supplied and installed at selected locations in Ukemberagya/Tswarev ward

8) Construction and Furnishing of a Block of Three Classrooms at Igbough, Mbavur ward (contact person is Hon. Ndiisaa Terhemen)

9) Refurbishment of a 300 KVA TRANSFORMER at Abeda, Mbavur Ward (contact person is Hon. Ndiisaa Terhemen)

10) Solar Street lights installed at selected locations in Mbavur ward.

11) Solar Street lights installed at Dusha, Turan ward.

12) When Sen. Suswam was Governor, he Extended Electricity from Abeda to Dusha. Reticulation of electricity in Dusha, the HQ of Turan will be completed soon.

14) Construction of a motorized Borehole with 10, 000 litres overhead water tank at Anyiin, Mbagber ward.

15) Solar Street lights installed at selected locations in Tombo, Mbagber, Mbavur, UK/Tswarev and Turan wards.

Leave a Reply

Your email address will not be published. Required fields are marked *